Review of Feasibility Study, Detailed Design and Preparation of Tender Documents – Bo-Yele-Matotoka Road (92kms)

ProjectReview of Feasibility Study, Detailed Design and Preparation of Tender Documents - Bo-Yele-Matotoka Road (92kms)CountrySierra LeoneYear2025ClientSierra Leone Roads Authority (SLRA)Share

Fundings :

African Development Bank (AfDB)

Characteristics :

The Bo–Yele–Matotoka road, approximately 92 km long, mainly crosses rural and semi-rural areas located in the Bo, Tonkolili and Bombali districts. The alignment runs through agricultural areas, low-lying zones prone to flooding and gently rolling terrain, and crosses numerous seasonal and permanent watercourses requiring appropriate hydraulic structures.

The existing road consists of a single carriageway with variable platform width and limited or deteriorated shoulders. Several sections no longer meet current geometric and structural standards. Drainage is provided by a significant number of culverts, box culverts and bridges, some of which show hydraulic or structural deficiencies given current and projected hydrological conditions.

Functionally, the road is a major regional corridor, connecting urban centers, rural communities and production areas, and ensuring year-round traffic continuity, particularly during the rainy season. The project includes the construction of 119 bridges and hydraulic crossing structures (maximum length of 145 m, minimum of 13 m).

Mission of IDC :

Review and update of the existing feasibility study; detailed topographic surveys along the entire road alignment; geotechnical investigations for pavement and structure design; hydrological and hydraulic studies for the design of drainage systems, culverts, box culverts and the 119 bridges; structural diagnosis and preliminary design of bridges and hydraulic structures; pavement condition assessment and road geometric design; traffic surveys and demand forecasting; economic and financial analysis of the project; initial environmental and social reconnaissance and identification of mitigation measures; preliminary assessment of resettlement impacts; preparation of tender documents (drawings, technical specifications, bills of quantities) in accordance with funding agency requirements; coordination with the client and stakeholders.