Fundings :
Project Management Unit (PNIU) under the Ministry of Agriculture and Water Resources of the Republic of Uzbekistan.
Characteristics :
The Project aims at increasing agricultural productivity in an agricultural area of about 210,000 hectares in Jizakhet and about 222,000 hectares in Syrdarya region, thus contributing to food security, increase in per capita income and standard of living of the target populations in these regions. The above objective will be achieved through the rehabilitation, construction and improvement of existing irrigation and drainage systems.
The works include:
A) Djizzak Region
(i) Construction with water works of PS3 with a discharge capacity of 18 m3ls.
(ii) Construction of an M2 canal between the existing pumping stations PS-2 and PS-3 with a length of 15 km and a discharge capacity of 18 m3ls.
(iii) Rehabilitation of the Djizzak main sewer (DMK) with a length of 88.2 km.
B) Syrdarya Region
(i) Rehabilitation of K-1 Interfarm Canal with a length of 22 km and a discharge capacity of 10.1 m3ls.
(ii) Rehabilitation of PR-4 Interfarm Canal with a length of 8 km and a discharge capacity of 5.0 m3ls.
(iii) Rehabilitation of the PR-4 Interfarm Canal with a length of 6 km and a discharge capacity of 7.35 m3ls.
(iv) Rehabilitation of the PR-4-1-8 Interfarm Canal with a length of 5 km and a discharge capacity of 2.35 m3ls.
(v) Rehabilitation of the K-3-5 inter-farm canal with a length of 15.85 km and a discharge capacity of 5.0 m3ls.
(vi) Rehabilitation of the Right Branch of the Canal – 7 km with a discharge capacity of 27.0 m3ls.
(vii) Land improvement measures in Mirzaabad district of Syrdarya region
Mission of IDC :
Detailed Design; Bid Documents and Supervision of Works