{"id":19825,"date":"2021-05-20T12:11:49","date_gmt":"2021-05-20T10:11:49","guid":{"rendered":"https:\/\/www.idc.com.tn\/?post_type=cpt_portfolio&#038;p=19825"},"modified":"2021-10-30T20:22:27","modified_gmt":"2021-10-30T18:22:27","slug":"tombo-gbessia-guinea","status":"publish","type":"cpt_portfolio","link":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/","title":{"rendered":"Construction project of the 2&#215;2 lane road between Tombo and Gbessia airport"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>Fundings :<\/strong><\/h3>\n\n\n\n<p>Kuwaiti Arab Economic Development Fund.<br>Arab Bank for Economic Development in Africa.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-0 is-cropped small_gap wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><\/ul><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>Characteristics :<\/strong><\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table is-style-regular\"><table><tbody><tr><td>The project includes the rehabilitation of the 2&#215;2 lane road between the city of Conakry and Gbessia airport as well as the construction of interchanges, pedestrian overpasses and cross roads. The works also include the diversion of the networks as well as the railway track.<br><br><strong>Lot 3&nbsp;: Madina &#8211; Kenien<\/strong><br>The construction of an uneven crossroads in Madina;<br>The maintenance of the main road with 2&#215;2 lanes;<br>The development of the taxi and mini-bus station;<br>The realization of the uneven crossroads of K\u00e9nien;<br>The construction of a northern service road from K\u00e9nien to Sogedi;<br>The construction of a second pedestrian bridge to the right of the secondary entrance to the University;<br>Locating and moving networks;<br>Carrying out earthworks;<br>Execution of drainage and sanitation works (scuppers, gutters, open and covered, outlets);<br>The construction of three reinforced concrete bridges on deep foundations for interchanges;<br>Carrying out road works;<br>Construction of the public lighting network, vertical and horizontal signs;<br>Construction of equipment (lighting, islands of greenery, etc.);<br>Finishing and connection work to existing structures.<br><strong>For the Path section iron, the works include:<\/strong><br>The relocation of the ONCFG railway line;<br>The paralleling of the new track with the CFCF track<br>between Km 2,750 and 7,000 and on the same level;<br>Construction of side ditches;<br>The laying of rails on metal sleepers;<br>The construction of 2 level crossings;<br>Welding of elementary bars in LRS;<br>Spreading the layers of ballast;<br>Rolling by locomotives or other machinery;<br><br><strong>Lot 5: Section T1-T2<br><\/strong>Locating and moving networks;<br>Preparatory work;<br>Earthworks for widening, upgrading of the platform and construction of accesses to the two interchanges;<br>Execution of drainage and sanitation works (scuppers, open and covered gutters, curbs and downspouts)<br>The execution of three reinforced concrete bridges on shallow or deep foundations for interchanges;<br>The construction of a pedestrian bridge;<br>Road works;<br>Construction of the public lighting network;<br>Construction of equipment (lighting, islands of greenery, etc.);<br>Finishing and connection work to existing structures.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Mission of IDC<\/strong> :<\/h3>\n\n\n\n<p>IDC is responsible for controlling and supervising the work of Lots 3 and 5, including management, planning, administrative services and contract administration.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Photos Gallery :<\/h3>\n\n\n\n<figure class=\"wp-block-gallery columns-0 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Fundings : Kuwaiti Arab Economic Development Fund.Arab Bank for Economic Development in Africa. Characteristics :&hellip;<\/p>\n","protected":false},"author":1,"featured_media":26401,"comment_status":"closed","ping_status":"closed","template":"","cpt_portfolio_group":[317,320],"class_list":["post-19825","cpt_portfolio","type-cpt_portfolio","status-publish","has-post-thumbnail","hentry","cpt_portfolio_group-infrastructure-of-transport","cpt_portfolio_group-mastery-of-the-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC\" \/>\n<meta property=\"og:description\" content=\"Fundings : Kuwaiti Arab Economic Development Fund.Arab Bank for Economic Development in Africa. Characteristics :&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/\" \/>\n<meta property=\"og:site_name\" content=\"IDC\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-30T18:22:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1693\" \/>\n\t<meta property=\"og:image:height\" content=\"956\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/\",\"url\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/\",\"name\":\"Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC\",\"isPartOf\":{\"@id\":\"https:\/\/www.idc.com.tn\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg\",\"datePublished\":\"2021-05-20T10:11:49+00:00\",\"dateModified\":\"2021-10-30T18:22:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage\",\"url\":\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg\",\"contentUrl\":\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg\",\"width\":1693,\"height\":956},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.idc.com.tn\/ar\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio\",\"item\":\"https:\/\/www.idc.com.tn\/ar\/portfolio\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction project of the 2&#215;2 lane road between Tombo and Gbessia airport\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.idc.com.tn\/fr\/#website\",\"url\":\"https:\/\/www.idc.com.tn\/fr\/\",\"name\":\"IDC\",\"description\":\"International Development Consultants\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.idc.com.tn\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/","og_locale":"en_US","og_type":"article","og_title":"Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC","og_description":"Fundings : Kuwaiti Arab Economic Development Fund.Arab Bank for Economic Development in Africa. Characteristics :&hellip;","og_url":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/","og_site_name":"IDC","article_modified_time":"2021-10-30T18:22:27+00:00","og_image":[{"width":1693,"height":956,"url":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/","url":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/","name":"Construction project of the 2x2 lane road between Tombo and Gbessia airport - IDC","isPartOf":{"@id":"https:\/\/www.idc.com.tn\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage"},"image":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage"},"thumbnailUrl":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg","datePublished":"2021-05-20T10:11:49+00:00","dateModified":"2021-10-30T18:22:27+00:00","breadcrumb":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#primaryimage","url":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg","contentUrl":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/AURELIENGILLIER_AfDB_2018_GUINEE-51-2_2018-08-16_120025.jpg","width":1693,"height":956},{"@type":"BreadcrumbList","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/tombo-gbessia-guinea\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.idc.com.tn\/ar\/"},{"@type":"ListItem","position":2,"name":"Portfolio","item":"https:\/\/www.idc.com.tn\/ar\/portfolio\/"},{"@type":"ListItem","position":3,"name":"Construction project of the 2&#215;2 lane road between Tombo and Gbessia airport"}]},{"@type":"WebSite","@id":"https:\/\/www.idc.com.tn\/fr\/#website","url":"https:\/\/www.idc.com.tn\/fr\/","name":"IDC","description":"International Development Consultants","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.idc.com.tn\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19825","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio"}],"about":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/types\/cpt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/comments?post=19825"}],"version-history":[{"count":11,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19825\/revisions"}],"predecessor-version":[{"id":26757,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19825\/revisions\/26757"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/media\/26401"}],"wp:attachment":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/media?parent=19825"}],"wp:term":[{"taxonomy":"cpt_portfolio_group","embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio_group?post=19825"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}