{"id":19803,"date":"2021-05-20T12:22:31","date_gmt":"2021-05-20T10:22:31","guid":{"rendered":"https:\/\/www.idc.com.tn\/?post_type=cpt_portfolio&#038;p=19803"},"modified":"2021-10-30T20:22:20","modified_gmt":"2021-10-30T18:22:20","slug":"uzbekistan-irrigation","status":"publish","type":"cpt_portfolio","link":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/","title":{"rendered":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Fundings :<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Project Management Unit (PNIU) under the Ministry of Agriculture and Water Resources of the Republic of Uzbekistan.<\/p>\n\n\n\n<h3 class=\"has-medium-font-size wp-block-heading\"><strong><strong>Characteristics :<\/strong><\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Project aims at increasing agricultural productivity in an agricultural area of about 210,000 hectares in Jizakhet and about 222,000 hectares in Syrdarya region, thus contributing to food security, increase in per capita income and standard of living of the target populations in these regions. The above objective will be achieved through the rehabilitation, construction and improvement of existing irrigation and drainage systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The works include:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A) Djizzak Region<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(i) Construction with water works of PS3 with a discharge capacity of 18 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(ii) Construction of an M2 canal between the existing pumping stations PS-2 and PS-3 with a length of 15 km and a discharge capacity of 18 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(iii) Rehabilitation of the Djizzak main sewer (DMK) with a length of 88.2 km.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">B) Syrdarya Region<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(i) Rehabilitation of K-1 Interfarm Canal with a length of 22 km and a discharge capacity of 10.1 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(ii) Rehabilitation of PR-4 Interfarm Canal with a length of 8 km and a discharge capacity of 5.0 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(iii) Rehabilitation of the PR-4 Interfarm Canal with a length of 6 km and a discharge capacity of 7.35 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(iv) Rehabilitation of the PR-4-1-8 Interfarm Canal with a length of 5 km and a discharge capacity of 2.35 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(v) Rehabilitation of the K-3-5 inter-farm canal with a length of 15.85 km and a discharge capacity of 5.0 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(vi) Rehabilitation of the Right Branch of the Canal &#8211; 7 km with a discharge capacity of 27.0 m3ls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(vii) Land improvement measures in Mirzaabad district of Syrdarya region<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped small_gap wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img fetchpriority=\"high\" decoding=\"async\" width=\"400\" height=\"286\" src=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img1-4.jpg\" alt=\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak \u2013 Uzbekistan \u2013 photo 1\" data-id=\"23382\" data-full-url=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img1-4.jpg\" data-link=\"https:\/\/www.idc.com.tn\/portfolio\/uzbekistan-irrigation\/img1-4\/\" class=\"wp-image-23384\" srcset=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img1-4.jpg 400w, https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img1-4-300x215.jpg 300w, https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img1-4-370x265.jpg 370w\" sizes=\"(max-width: 600px) 100vw, 400px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"400\" height=\"286\" src=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img2-9.jpg\" alt=\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak \u2013 Uzbekistan \u2013 photo 2\" data-id=\"23385\" data-full-url=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img2-9.jpg\" data-link=\"https:\/\/www.idc.com.tn\/portfolio\/uzbekistan-irrigation\/img2-9\/\" class=\"wp-image-23387\" srcset=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img2-9.jpg 400w, https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img2-9-300x215.jpg 300w, https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/10\/img2-9-370x265.jpg 370w\" sizes=\"(max-width: 600px) 100vw, 400px\" \/><\/figure><\/li><\/ul><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong><strong>Mission<\/strong><\/strong><\/strong> of IDC :<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed Design; Bid Documents and Supervision of Works<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong><strong>Photos Gallery<\/strong><\/strong><\/strong> :<\/h3>\n","protected":false},"excerpt":{"rendered":"<p>Fundings : Project Management Unit (PNIU) under the Ministry of Agriculture and Water Resources of&hellip;<\/p>\n","protected":false},"author":1,"featured_media":23380,"comment_status":"closed","ping_status":"closed","template":"","cpt_portfolio_group":[303,320],"class_list":["post-19803","cpt_portfolio","type-cpt_portfolio","status-publish","has-post-thumbnail","hentry","cpt_portfolio_group-water-and-environment","cpt_portfolio_group-mastery-of-the-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC<\/title>\n<meta name=\"description\" content=\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC\" \/>\n<meta property=\"og:description\" content=\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/\" \/>\n<meta property=\"og:site_name\" content=\"IDC\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-30T18:22:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/Sans-titre-7-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/\",\"url\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/\",\"name\":\"Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.idc.com.tn\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Sans-titre-7-1.jpg\",\"datePublished\":\"2021-05-20T10:22:31+00:00\",\"dateModified\":\"2021-10-30T18:22:20+00:00\",\"description\":\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.idc.com.tn\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Sans-titre-7-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.idc.com.tn\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Sans-titre-7-1.jpg\",\"width\":1920,\"height\":1920,\"caption\":\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak \u2013 Uzbekistan\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/uzbekistan-irrigation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio\",\"item\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/portfolio\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/\",\"name\":\"IDC\",\"description\":\"International Development Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#organization\",\"name\":\"IDC - International Development Consultants\",\"url\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.idc.com.tn\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo-1-1.png\",\"contentUrl\":\"https:\\\/\\\/www.idc.com.tn\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/logo-1-1.png\",\"width\":75,\"height\":75,\"caption\":\"IDC - International Development Consultants\"},\"image\":{\"@id\":\"https:\\\/\\\/www.idc.com.tn\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"areaServed\":[{\"@type\":\"AdministrativeArea\",\"name\":\"Sub-Saharan Africa\"},{\"@type\":\"Country\",\"name\":\"The Gambia\"},{\"@type\":\"Country\",\"name\":\"Mali\"},{\"@type\":\"Country\",\"name\":\"Djibouti\"},{\"@type\":\"Country\",\"name\":\"Senegal\"},{\"@type\":\"Country\",\"name\":\"Cameroon\"},{\"@type\":\"Country\",\"name\":\"Sierra Leone\"},{\"@type\":\"Country\",\"name\":\"Guinea\"},{\"@type\":\"Country\",\"name\":\"Ivory Coast\"},{\"@type\":\"Country\",\"name\":\"Cape Verde\"},{\"@type\":\"Country\",\"name\":\"Algeria\"},{\"@type\":\"Country\",\"name\":\"Tunisia\"}],\"knowsAbout\":[\"Consulting engineers\",\"Engineering consultancy\",\"Feasibility studies\",\"Preliminary and detailed engineering design\",\"Tender documents\",\"Project management consultant\",\"Owner's engineer\",\"Construction supervision\",\"Supervision of road works\",\"Buildings\",\"Energy\",\"Water supply and sanitation\",\"Urban and rural development\"],\"knowsLanguage\":[\"fr\",\"en\",\"ar\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC","description":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/","og_locale":"en_US","og_type":"article","og_title":"Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC","og_description":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026","og_url":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/","og_site_name":"IDC","article_modified_time":"2021-10-30T18:22:20+00:00","og_image":[{"width":1920,"height":1920,"url":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/Sans-titre-7-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/","url":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/","name":"Uzbekistan \u2013 Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak | IDC","isPartOf":{"@id":"https:\/\/www.idc.com.tn\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/#primaryimage"},"image":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/Sans-titre-7-1.jpg","datePublished":"2021-05-20T10:22:31+00:00","dateModified":"2021-10-30T18:22:20+00:00","description":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya\u2026 Uzbekistan, 2010. Funded by Project Management Unit (PNIU) under the Ministry of\u2026","breadcrumb":{"@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/#primaryimage","url":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/Sans-titre-7-1.jpg","contentUrl":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2020\/05\/Sans-titre-7-1.jpg","width":1920,"height":1920,"caption":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak \u2013 Uzbekistan"},{"@type":"BreadcrumbList","@id":"https:\/\/www.idc.com.tn\/en\/portfolio\/uzbekistan-irrigation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.idc.com.tn\/en\/"},{"@type":"ListItem","position":2,"name":"Portfolio","item":"https:\/\/www.idc.com.tn\/en\/portfolio\/"},{"@type":"ListItem","position":3,"name":"Irrigation and Drainage Network Rehabilitation Project in Syrdarya and Djizzak"}]},{"@type":"WebSite","@id":"https:\/\/www.idc.com.tn\/en\/#website","url":"https:\/\/www.idc.com.tn\/en\/","name":"IDC","description":"International Development Consultants","publisher":{"@id":"https:\/\/www.idc.com.tn\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.idc.com.tn\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.idc.com.tn\/en\/#organization","name":"IDC - International Development Consultants","url":"https:\/\/www.idc.com.tn\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.idc.com.tn\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/08\/logo-1-1.png","contentUrl":"https:\/\/www.idc.com.tn\/wp-content\/uploads\/2021\/08\/logo-1-1.png","width":75,"height":75,"caption":"IDC - International Development Consultants"},"image":{"@id":"https:\/\/www.idc.com.tn\/en\/#\/schema\/logo\/image\/"},"areaServed":[{"@type":"AdministrativeArea","name":"Sub-Saharan Africa"},{"@type":"Country","name":"The Gambia"},{"@type":"Country","name":"Mali"},{"@type":"Country","name":"Djibouti"},{"@type":"Country","name":"Senegal"},{"@type":"Country","name":"Cameroon"},{"@type":"Country","name":"Sierra Leone"},{"@type":"Country","name":"Guinea"},{"@type":"Country","name":"Ivory Coast"},{"@type":"Country","name":"Cape Verde"},{"@type":"Country","name":"Algeria"},{"@type":"Country","name":"Tunisia"}],"knowsAbout":["Consulting engineers","Engineering consultancy","Feasibility studies","Preliminary and detailed engineering design","Tender documents","Project management consultant","Owner's engineer","Construction supervision","Supervision of road works","Buildings","Energy","Water supply and sanitation","Urban and rural development"],"knowsLanguage":["fr","en","ar"]}]}},"_links":{"self":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio"}],"about":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/types\/cpt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/comments?post=19803"}],"version-history":[{"count":23,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19803\/revisions"}],"predecessor-version":[{"id":26756,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio\/19803\/revisions\/26756"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/media\/23380"}],"wp:attachment":[{"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/media?parent=19803"}],"wp:term":[{"taxonomy":"cpt_portfolio_group","embeddable":true,"href":"https:\/\/www.idc.com.tn\/en\/wp-json\/wp\/v2\/cpt_portfolio_group?post=19803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}